Lefever Hill Rehabilitation Project Prep Day
Help repair the Rachel Carson Trail on Lefever Hill
- http://ns2.rachelcarsontrails.org/Members/sgmentzer/rctmd2017a
- Lefever Hill Rehabilitation Project Prep Day
- 2017-04-23T09:00:00+04:00
- 2017-04-23T13:00:00+04:00
- Help repair the Rachel Carson Trail on Lefever Hill
- WhenApr 23, 2017 from 09:00 AM to 01:00 PM (Etc/GMT-4 / UTC400)
- WhereLefever Hill lot
- Contact NameMark Eyerman
- Contact Phone412-492-0375
- Add event to calendariCal
We need several people to assist while we cut logs and stakes which will be used as structural members to secure the hillside which has eroded in spots. We need to cut 8 logs, 8'-25' long and approximately 25 stakes to secure them into position. If possible, we'll transport what we can to the work sites. Work includes safety monitor of the chainsaw operator, lifting and carrying. Bring work gloves and water (spare gloves will be available). Meet at the small parking lot at the base of Lefever Hill at Costa Construction adjacent to the railroad tunnel.