Keystone Power Plant/RRI/Gai Consultant letter of open access 5/26/2010Permission given to return the trail to the orginal corridor or close to it. This is after the construction. http://ns2.rachelcarsontrails.org/Members/pabrunner/baker-information/AR-M317_20100625_073525.pdf/viewhttp://ns2.rachelcarsontrails.org/@@site-logo/RCTClogo.svg
Keystone Power Plant/RRI/Gai Consultant letter of open access 5/26/2010
Permission given to return the trail to the orginal corridor or close to it. This is after the construction.