Coon Creek Bridge 2007

Saturday January 13, 2007 Project Leader Keith Klos has built, marked and disassembled a 16 foot bridge. It is ready for installation. The shortest route from the road to the bridge site is about ½ mile. We need to carry the disassembled structure in and reassemble it. We need volunteers to help with this project! PLEASE Location: 2 miles north of Vowinkle. 1.5 Miles south of the northern Baker Trailhead. Start time 10AM at worksite – call for directions Shuttle meets in Kittanning 8:30AM. We might be able to use a small cabin in the area Friday or Saturday Night if needed. I’ll provide sandwiches for lunch. Equipment required: old external frame packs without the fabric, light rope to secure the material to the frame or 10ft of sizzle rope to carry bundles. Hammers, GLOVES, boots, warm layered gear, water, other food as needed.
  • Coon Creek Bridge 2007
  • 2007-01-13T10:00:00-04:56
  • 2007-01-13T18:55:00-04:56
  • Saturday January 13, 2007 Project Leader Keith Klos has built, marked and disassembled a 16 foot bridge. It is ready for installation. The shortest route from the road to the bridge site is about ½ mile. We need to carry the disassembled structure in and reassemble it. We need volunteers to help with this project! PLEASE Location: 2 miles north of Vowinkle. 1.5 Miles south of the northern Baker Trailhead. Start time 10AM at worksite – call for directions Shuttle meets in Kittanning 8:30AM. We might be able to use a small cabin in the area Friday or Saturday Night if needed. I’ll provide sandwiches for lunch. Equipment required: old external frame packs without the fabric, light rope to secure the material to the frame or 10ft of sizzle rope to carry bundles. Hammers, GLOVES, boots, warm layered gear, water, other food as needed.
  • WhenJan 13, 2007 from 10:00 AM to 06:55 PM (US/Eastern / UTC-494)
  • WhereBaker Trail, North of Vowinkle, PA
  • Contact Name
  • Contact Phone724-325-3224
  • Add event to calendariCal